East End Stage 3 & 4

121 Hunter Street, Newcastle NSW 2300
Apartments

195

Estimated completion date

2032

Buildings

4

Building Type

Mid-rise

East End Stage 3 & 4

More about East End Stage 3 & 4

  • Stages 3 and 4 of East End involve the construction of multiple buildings in a mixed-use development.
  • Stage 3 focuses on Building 3 West (Gibbs & Moore) and involves demolishing existing structures on the site.
  • Building 3 West is a 7-storey mixed-use building with a total area of 5851 square meters.
  • It will consist of 11 one-bedroom apartments, 38 two-bedroom apartments, 3 three-bedroom apartments, and 3 retail premises.
  • There will be two residential lobbies accessed from Thorn Street and a public space between Thorn Street and the building.
  • Services, including a substation, will be located in the basement car parking area.
  • Building 3 East (Civic & Bluebell) is also part of Stage 3 and will undergo demolition.
  • It will be a 10-storey mixed-use building with a total area of 3735 square meters.
  • Building 3 East will include 4 one-bedroom apartments, 26 two-bedroom apartments, 8 three-bedroom apartments, and 2 retail tenancies.
  • It will have a loading dock level with a 14-meter-wide turntable and two residential lobbies accessed from the laneway.
  • There will be 473 square meters of communal open space.
  • Stage 4 involves the construction of Building 4 North (Portline), an 8-storey mixed-use building.
  • It will have a total area of 3401 square meters and include 3 one-bedroom apartments, 15 two-bedroom apartments, 5 three-bedroom apartments, and 3 retail tenancies.
  • There will be 112 square meters of communal open space, and services and a plant room may be located on either the first floor or the building's rooftop.
  • The construction of the Laing Lane Cafe is also part of Stage 4.
  • Building 4 South (Kingston) is another component of Stage 4 and will be a 9-storey residential building.
  • It will have a total area of 9755 square meters and include 6 one-bedroom apartments, 65 two-bedroom apartments, and 11 three-bedroom apartments.
  • There will be 479 square meters of communal open space.
  • A turntable and loading dock will be located in Basement Level 1, and residential lobbies will be accessed from Laing Street Laneway and King Street.
  • The building will feature brickwork, steel and glass balustrades, and concrete walls.
  • There will be basement car parking for 314 vehicles, including 25 electric vehicle spaces, with Stage 3 accommodating 175 vehicles and Stage 4 accommodating 139 vehicles.
  • The development will also include associated landscaping.

Development information for East End Stage 3 & 4

Local Government Area:
Newcastle (City)
Project Status:
In Planning
Listing Type:
Mixed Use
Estimated Completion Date:
2032
Floor Count:
10

Meet the team behind East End Stage 3 & 4

Location of East End Stage 3 & 4

What's nearby?